New Pool Project Checklist

A printable planning checklist for a new inground pool, covering site, budget, construction, equipment, cover coordination, and handover.

Direct answer

Use this checklist before drawings are final. Confirm site access, setbacks, budget structure, shell method, equipment location, and whether an automatic cover needs a vault, track, drain, and power reservation. Print or download the v1 sheet and keep it with the project file.

Key takeaways

  • Lock site, waterline, and access before excavation.
  • Write equipment and cover reservations on the same sheet as the shell method.
  • Treat the HTML table as the canonical version; the PDF is a print companion.
  • Local permits and inspections still override any generic list.

This page is the canonical HTML version of the new-pool project checklist, version 1, updated 27 August 2026. Download the printable PDF or use the browser print command. The tables below are the source. The PDF is a companion.

White layout line on a lawn marking a future pool in front of a house.
Lock site, waterline, and access on this sheet before the hole is opened.

Site and access

Item Status Notes
Property setbacks and easements confirmed
Excavation and pump-truck access path
Underground utilities marked
Neighbor and grade constraints written down
Desired waterline and finished-deck elevation

Budget structure

Cost group In scope? Owner of the decision
Shell and excavation
Plumbing, electrical, and bonding
Equipment package
Automatic cover, vault, and power
Coping, deck, and drainage
Interior finish
Permits, inspections, and contingencies

Do not invent a single national price. Record who owns each group and what is still unknown.

Construction and equipment

Decision Choice Locked before excavation?
Shell method Concrete / fiberglass / other
Equipment pad or room location
Heat source
Automation / controls
Cover type and track None / automatic / other
Cover vault, drain, and power

Handover

Item Received
As-built equipment list
Finish and start-up instructions
Cover operating limits, if installed
Warranty contacts for equipment only, not this site
Diagram of pool setbacks from the top and toe of a slope.
Grade and setbacks belong in the site block.

Related reading: the pool construction process, the equipment BOM, and the pool planning hub.

Frequently asked questions

Is this a construction contract checklist?

No. It is a planning sheet for owners, designers, and project buyers. It does not replace drawings, specifications, or a contractor agreement.

Which version should I cite?

Cite the HTML page and the dated PDF filename `new-pool-project-checklist-v1.pdf`. If the page date and the PDF version disagree, the HTML page wins.

Sources

  1. Model Aquatic Health Code — U.S. Centers for Disease Control and Prevention Accessed August 27, 2026.

About the author

Editor

Lauren Crowe writes and reviews Fielder Pools guides from public technical sources. She is an editor, not a licensed engineer or contractor.

  • Source checks against manufacturer manuals and official guides
  • Documented correction and update workflow
  • Clear separation of sourced fact and editorial judgment