Complete In-Ground Pool Construction Phase and Engineering Guide
The 10 stages of a gunite or shotcrete pool build, the inspection and test at each hold point, and the three timing clocks owners mix up.
Editorial archive
Page 2 of the Fielder Pools editorial archive.


The 10 stages of a gunite or shotcrete pool build, the inspection and test at each hold point, and the three timing clocks owners mix up.
What decides whether an existing pool can take an automatic cover, which track and housing options fit retrofits, and when a remodel is the honest route.
A new-construction coordination checklist for automatic pool covers, covering measurement, track type, vault, drainage, power, coping, and equipment location.
What designers and builders must coordinate to integrate an automatic pool cover into new construction, from shape and track to vault, drainage, and power.
How to plan an automatic pool cover during design, covering track type, vault geometry, drainage, drive choice, and what must reach the construction drawings.
How automatic pool fill systems work, where the fill line and leveler belong in construction, the backflow protection they require, and their leak-masking risk.