Gunite Watering Schedule: 7 Days Continuously Moist
Keep new gunite continuously moist for at least 7 days. ACI 308.1-98 uses that default above 10 °C, or 70 percent of specified strength.
Topic tag
Page 2 of published guides tagged pool-construction.
Keep new gunite continuously moist for at least 7 days. ACI 308.1-98 uses that default above 10 °C, or 70 percent of specified strength.
Compare pool drainage channel widths, 2% deck grading slopes, 22 inches deep French drain trench specs, and on-property drywell limits to stop standing water.
Review concrete-pool waterline tile and coping: membrane extent, submerged-use approvals, Basecrete and HYDRO BAN documents, joints and owner records.
Check water-test scope, PVC cement cure, pressure records and trench support before gunite conceals pool plumbing. Use your project's acceptance requirements.
Compare gunite and wet-mix shotcrete pool strength: 4,000 psi (28 MPa) 28-day specs, w/cm 0.30-0.42 control, ASTM C1140 core testing, and rebound disposal.
Unexpected ground can cause costly delays in a pool build. Confirm the soil investigation, groundwater assumptions and excavation protection before agreeing to dig.